Made some good progress over the last 2 days.
Cured the carb flooding issue. The carbs have a float with a brass tang in the centre which bears down on the needle valve. I found the angle was at 45 deg and not true to the needle valve causing a side load on the needle and jamming open, hence the flood of fuel.
Tick off the List.
Got the engine running better, far better with oh-so-small incremental movements of the tick over screw and the pilot air/fuel ratio screw, talk about a tight rope tuning. These carbs are infamous for this quirk.
Tick off the List.
Fixed the loose headlamp mountings by re-assembling the top fork handle bar yoke and all snugged-down nice and tight. No headlanp shakes now.
Tick off the List.
Trial and fitted the mega expensive side panels except they didn't fit at first. Numpty here had placed the tool box in the wrong pair of mounting holes in the chassis frame, what a faff to move and re-fit! All on now.
Tick off the List.
Fuel tank back on and fully coupled up. Pesky balance tube connecting the left and right sides of the tank fought me all the way, but lost.
Tick off the List.
Fitted the new seat from Taiwan, what a bargain for £100 delivered, resplendent with the 'HONDA' script of course. Perfect fit, fabulous.
Tick off the List.
Fitted the aluminium number plate at long last, really looks the Classic it is.
Nearly completed now, waiting for a new expensive starter chain to arrive and the bike can come down off the stand although it is very convenient on the stand while I prepare for some work on the Lola and the 911.
3 weeks late on the project!